https://www.engineeringnews.co.za
Cutting|Design|Energy|Power|Maintenance|Solutions
Cutting|Design|Energy|Power|Maintenance|Solutions
cutting|design|energy|power|maintenance|solutions

Outa calls for bold decisions to end load shedding

12th February 2019

By: African News Agency

  

Font size: - +

The Organisation Undoing Tax Abuse (Outa) on Tuesday called on government to make bold interventions to minimise load shedding by the State-owned power utility.

This as Eskom on Monday unexpectedly began cutting off power supply with stage 4 load shedding after six power generating units tripped. The power utility said on Tuesday it will implement stage 3 load shedding and cut up to 3 000MW power supply.

Ronald Chauke, Outa's energy portfolio manager, said entering stage 4 load shedding signals a dire situation for Eskom's energy generation and raises major concerns for the economy, adding that clearly there is a serious problem at Eskom. 

"Eskom’s aging power plants require urgent attention to keep the lights on and it would appear that, aside from the lack of maintenance over the past years which is catching up with us today, the shortage of skills and expertise to manage, maintain and operate these aging plants has added to Eskom’s woes," Chauke said. 

Chauke said the situation was extremely damaging for the South African economy and called for urgent intervention, even if this required the importation of international expertise and recalling retired engineers and experts who have the institutional knowledge of these power plants.

"We believe it is time for South Africa to enable and encourage self-generation solutions on a large scale," Chauke said. "This will in turn reduce pressure on Eskom to meet the country’s demands, which it is clearly struggling to do."

On Monday afternoon, the Eskom board convened an urgent meeting with the company's executive management and the minister of public enterprises, Pravin Gordhan, to discuss ways to deal with load shedding.

The board resolved to institute an urgent review to establish when the new build programme and its fleet of older power stations will be completed, the extent of design and other operational faults, what steps can be implemented to minimize the ever escalating costs and what can be done to increase output.

Edited by African News Agency

Comments

Latest News

Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024

Showroom

Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 
Actom image
Actom

Your one-stop global energy-solution partner

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.049 0.107s - 141pq - 2rq
Subscribe Now