| City Power running out of stock material due to load-shedding and vandalism |
| City Power is unable to keep up with running mini-substations due to the higher stages of load-shedding. Spokesperson Isaac Mangena said they have ... Published 2023-01-21 06:09:36 |
| WRENELLE STANDER: How SA can power green investments and end load-shedding |
| Published 2023-01-21 06:00:23 |
| Eskom: Stage 3 rolling blackouts from Saturday - OFM |
| Published 2023-01-21 05:41:15 |
| Eskom to ease power cuts over weekend - East Coast Radio |
| Eskom is set to ease load shedding to stage 3 from 5am to 4pm on Saturday, with a further reduction in the power cuts planned for Sunday. Published 2023-01-21 04:46:51 |
| CoE faces technical challenges caused by loadshedding | Kempton Express |
| Residents can log a call with the call centre on 0860 54 3000 should power not be restored two hours after the ending of scheduled load shedding. Published 2023-01-21 04:11:08 |